ADMINISTRATION:
Triennial Review Outcome
On July
28-29, 2008, CyRide went through a formal review of 23 oversight
areas which we certify to follow in exchange for receiving federal
funds from the Federal Transit Administration. This two-day on-site
review followed a desk review of CyRide’s submission of over 230
questions and various plans/manuals/documents in digital format to
the consultant. CyRide was congratulated in their organization of
their electronic submission as the best received thus far.
Within
the two-day review, the consultant reviewed procurement and
financial files, requested additional documentation as necessary to
determine compliance, and received clarification to many remaining
questions from the desk review. As a result, CyRide received
successful compliance in 21 of the 23 areas.
CyRide
did however receive minor deficiencies in the Maintenance and
Drug-Free Workplace areas which staff must perform corrective
actions. Under Maintenance, CyRide must document and retain
preventive maintenance activities on its facility and equipment to
ensure that more than 80 percent of the inspections are being
performed on time. Records were maintained, however; the
maintenance software did not retain them for each inspection period
and therefore could not be retrieved and substantiated to the
consultant. CyRide will work to create a spreadsheet of these
inspections and report these inspections to FTA for the next three
months. For Drug-Free Workplace, CyRide must develop an on-going
drug-free awareness program. CyRide employees currently have this
information within their driver training manual but do not receive
this information as a repeated measure for on-going compliance.
Therefore, CyRide staff will develop/distribute a flyer to all
employees quarterly as our on-going effort of CyRide’s drug-free
awareness program.
Under
the Safety & Security area, two advisory comments were made.
Currently, security information is not provided to our passengers
and we do not share intelligence with other federal agencies. As a
result, staff will be implementing an interior sign placard to be
placed on our buses educating and requesting customers to notify the
driver of unusual behavior by another passenger or suspicious
packages. CyRide staff will also research and participate in a
regional intelligence sharing task force to relay security issues
across the nation.
All in
all, administrative staff spent only 172 hours in preparing and
participating in the triennial review process receiving minimal
corrective actions to our program. However, it is the
implementation of our day-to-day operations with a customer driven
focus that makes CyRide such a quality transit program. Thanks to
each one of our employees for following and implementing all of
those federal and state requirements that in turn make our system an
intrinsic value to the Ames community and Iowa State University.
(Sheri K. and Shari A.)
Projects Approved by the Iowa Department of Transportation –
CyRide submits
an annual grant application to the Iowa Department of Transportation
(IDOT) in May of each year for operating and capital projects from
several different federal and state funding sources. To date, the
IDOT commission has approved the following projects for CyRide
totaling $539,153 in federal/state improvements:
Federal
Total
Brown
Route Summer Weekend Frequency Expansion (Yr2 cont)
$13,203 $26,406
Brown
Route Weeknight Hours Expansion (Yr2 - cont)
$11,567 $23,134
Gray
Route 4A Route Expansion (Yr2 -
cont) $2,383
$4,766
Steam
Cleaning Area Rehabilitation (new)
$512,000 $640,000
$539,153
$694,306
In addition,
the Iowa DOT funded a new regional transportation service from Ames
to Iowa City for medical purposes and a light-duty bus totaling
$82,159. This project was derived from a planning process that
CyRide staff facilitated on behalf of the Ames Area MPO. However,
Heartland Senior Services will operate this regional service
benefiting Story County and Ames residents that could begin as early
as July 2009 once all the local funding is approved. CyRide is
still facilitating this local funding initiative. (Shari A.)
Upcoming
Noteworthy Projects –
CyRide has quite a few upcoming noteworthy projects and plans that
will be forthcoming in the next year and beyond. These projects are
outlined below:
1.
CyRide Facilities Study
– Staff hired P&B consultants to look at CyRide’s future space needs
and existing site to determine alternatives for growing in the
future. (currently underway!)
2.
Alternatives Analysis
–
Orange Route Corridor
– Staff will hire a consultant through $160,000 in federal funding
to further analyze the Orange Route corridor to see if Bus Rapid
Transit operation is feasible for the community. This study should
begin in October 2008.
3.
Wash
Bay Rehabilitation
– CyRide received $512,000 in state grant funding through the Rural
Iowa Infrastructure Fund (RIIF) to rehabilitate the old wash bay and
reconstruct the cracking walls and floor. This rehabilitation
should occur this fall.
4.
Shop
HVAC/Exhaust System Construction
– CyRide received $160,000 in state funding to reconstruct the
exhaust system in the shop area to make the air cleaner for its
employees. This construction should occur within the next year.
5.
Marketing Plan Implementation
– CyRide received a grant through Iowa’s Clean Air and Attainment
program to fund a marketing program. This is the first marketing
dollars for CyRide so look for new developments within the upcoming
year to market CyRide to the community!
6.
Bus
Stop Plan Implementation
– CyRide’s Bus Stop Plan is scheduled to be complete at the end of
August after which shelters could be procured to implement its
results.
7.
Bike
Rack Program Implementation/Education
– Bike Racks have been procured and are currently on order. Staff
will need to create an implementation of this program along with
education for our drivers as well as passengers in utilizing the
bike racks. Staff will be creating a video, brochure and website
information. (currently underway!)
8.
Passenger Transportation Development Plan
– SAFETEA-LU requires an annual coordinated planning effort between
human service agencies and transportation providers (including
transit and all agency providers) to coordinate transportation
within their metropolitan area. This responsibility falls on each
MPO/RPA within Iowa however the Ames Area MPO delegates the
responsibility to CyRide. This effort is an annual effort and has
continued for Ames through meetings led through the United Way of
Story County’s Transportation Collaboration Committee. (Planning
efforts for document is October – April of each year.)
9.
CyRide Vanpool Program Analysis
– An initial survey has been completed by ISU faculty/staff.
Additional research could be completed with area businesses to
determine if a general public vanpool program would be essential to
the community. ISU’s Transportation Department that currently
provides vanpools is assessing whether they want a general public
program. Currently only ISU employees can participate within their
program.
10.
Des
Moines to Ames Service Development
– CyRide’s Board has discussed that CyRide needs to look at service
and/or new program that addresses the corridor between Ames and Des
Moines for employees within the Ames community and residents of
Ames. This service development would discuss possible partnering
with DART in Des Moines to connect the communities. A
vanpool/carpool program could be another potential improvement for
this corridor.
11.
Fare
Free Program Modification
– CyRide developed a fare free program and applied for grant funding
through the State’s Office of Energy but was rejected. A
modification could be made based on the Board’s wishes for certain
days
(i.e. weekends only OR summer only) or a groups (i.e. ISU
faculty/staff AND/OR City of Ames staff).
12.
Student Focus Group Meetings
– ISU’s Government of the Student Body requested that CyRide conduct
focus group meetings with students in an effort to provide more
direct participation with CyRide in discussing transportation issues
and to ensure their needs are being met.
13.
Google Transit Trip Planner
– Ultimately, CyRide would like to develop its website into having
trip planner capability. Trip planners provide a way for passenger
to plug in their origin/destinations and have a schedule spit out
they could travel. This eliminates figuring out schedules for our
customers. However, typically this development is expensive.
Google Transit is an option for transit providers that do not have a
large budget to develop their own trip planner and coordinate this
effort through Google.
14.
School Coordination Project
– The Ames City Council requested that CyRide look into coordinating
with the schools to transport students as needed. Currently CIT
contracts with the Ames’ schools and provides transportation but it
was expressed that perhaps savings could occur in utilizing CyRide
as well.
15.
Fall/Winter Ridership & Bus Analysis
– Staff will evaluate the fall/winter ridership to provide an
efficiency comparison on where CyRide could increase ridership
throughout the community without adding additional buses. They will
also work to determine where expansion needs are necessary. (Shari A
& Sheri K.)
OPERATIONS:
Meetings with the City Manager –
All
employees will be scheduled for meetings with City Manager, Steve
Schainker, over the next few months. The purpose of these meetings
is for Steve to get some feedback from employees about our efforts
in becoming a values-driven organization using a City of Ames
developed model called “Excellence Thorough People” (ETP). A memo
to all employees will be distributed shortly explaining the ETP
process in more detail. Some employees will be scheduled into
meetings being held at City Hall but many CyRide drivers will be
scheduled to attend a meeting held here at CyRide in order to
accommodate various schedules. (Karen)
Uniform Changes –
In an
effort to continually improve CyRide’s professional image to the
public, the next phase of uniform upgrades will be implemented
starting August 2008. Black pants, shorts, belts, and socks will be
implemented during this second phase according to the policy that
went into effect October 1, 2007. Carpenter Uniform will be at
CyRide between August 27-29, 2008 to help measure employees and
facilitate this process. A notice will be posted shortly of the
exact times they will be available. Please also note that employees
will be required to wear black shoes of their choosing in addition
to the items listed above provided by CyRide. Coats and sweaters
will be the last phase of this process scheduled for August 2009.
If you
have questions or need more information regarding your uniform
needs, please see Joanne. (Joanne)
CyRide’s Ready to Rack’n Roll -
In the next month, CyRide will be
unveiling CyRide’s Rack’n Roll Program with over 10 buses being
installed with bike racks. Thus far, our four new buses have a bike
rack installed with an additional 11 on order for maintenance staff
to install. The Rack n’ Roll brochure has also been developed by
staff so check it out! This new program results from our previous
CyRide Board Chair’s, Matthew Goodman’s, parting wishes. Rack’n
Roll installs a sustaining effort to “go green” for the entire Ames
community.
However, since the bus garage is at capacity, not all buses
can be equipped with a bike rack as each bus takes an extra foot of
space to park. Staff has already indicated which trips will be
accommodating bike racks on the fall schedule with a bike symbol.
The primary routes with bike racks are the Red, Green, Blue and
Brown routes. Drivers will be thoroughly trained on how to
load/unload a bike as well as drive a bus with the bike loaded which
may require some additional training sessions. The Rack’n roll
program will be discussed thoroughly at CyRide’s driver fall
meeting. As we are still working out the details of the program
including the “roll-out” date, keep your eyes open for additional
information on CyRide’s website and through upcoming training
sessions and get ready to Rack’n Roll!
(Shari A.)
HIRING AND
TRAINING:
Fall
Meetings are Just around the Corner
We look forward to seeing all of you in the fall meetings during the
next few weeks.
The training portion of the meeting will focus on a customer service
aspect of our jobs, but like nearly everything we do, it also
impacts safety. (Tom and George)
Many
New Faces
Maybe you’ve noticed a lot of new faces on the picture board this
summer. George and Tom have been very busy hiring and training
drivers for the start of the fall semester. Take a minute to welcome
them aboard! (Tom and George)
FLEET AND
FACILITIES
Fleet Issues-
Gillig Buses: The four new Gillig lowfloors should be ready for
service shortly. They are numbered 0819, 0820, 0821, 0822. The
first two digits denote the model year and the last two digits
indicate the unit number. The funny looking exhaust pipe is called
an exhaust diffuser. It is the final part of an exhaust
regeneration process that is required for 2008 engines. The
regeneration that takes place occurs at extremely high temperatures
and the diffuser on top of the bus acts to cool the exhaust. Care
needs to be taken in the fall so that these units are not parked
under trees for extended periods in the rare event that it may start
the leaves on fire. More information on these buses will be given
out in the fall meetings.
Support
Vehicles:
CyRide had hoped to have our first hybrid relief vehicle on order by
this time. As the price of gas went up, so did the demand for this
type of vehicle. As part of a local government, CyRide can purchase
cars and trucks at extremely attractive prices. However, when
demand outstrips supply, government orders go to the end of
extremely long lists. Staff revised our plans and will be bidding a
flex-fuel car shortly to be used as a relief/administration vehicle.
It should be delivered this fall. If possible, CyRide will place
an order for hybrid car with the best case scenario of delivery in
fall of 2009. As a result, CyRide will be migrating away from using
minivans and minibuses as relief vehicles to help save on fuel.
Energy
Reductions:
Once classes resume, we will start using almost 1,000 gallons of
diesel daily so anything our employees can do to help save on fuel
and energy would be greatly appreciated. At this volume, even
slight modifications in driving behavior can have a significant
impact to increase our miles per gallon. For example, gradual
accelerations and stops can save CyRide tremendous amounts of money
as well as minimizing aggressive driving complaints. In addition,
keeping the garage doors closed during the winter can save thousands
as well. Did you know there is approximately 1.5 acres under roof
here? The monthly cost to heat our facility has exceeded
$15,000 in winters past. Let’s agree to work on keeping these costs
to a minimum this winter! (Rich)
Building Issues –
CyRide
is slowly getting the remaining building items purchased and
installed thanks to the help of our lane workers. Areas that are
still pending include two 40-gallon trash cans for breakroom
(backordered; so we’re utilizing the recycling bins for now),
east-side parking lot reconfiguration, final furniture installation
including larger table for breakroom, new welcome board, and clock
installation. In addition, many of the pictures are being hung
throughout the facility with areas designated for marketing, safety,
etc. Thank you to everyone for being patient during this time. If
you still have suggestions/issues that need addressed, please see
Rich or Barb. (Rich)